Curtain Wall Glazing: Step-by-Step Guide

Updated November 23, 2026

Total time
8 hr
prep 4 hr · cook 0 min
Serves
1
one portion

Jump to recipe

Curtain wall glazing is a non-structural exterior wall system, typically aluminum-framed with glass infill panels, that keeps weather out while letting in natural light. It’s a staple of modern commercial architecture, and this guide walks you through the process of installing a basic stick-built curtain wall—from layout to final sealant—so you understand each step and can execute it safely and accurately on site.

Ingredients

  • 1 set of aluminum curtain wall mullions and transoms (per shop drawings)
  • 1 roll of structural silicone sealant (e.g., Dow 795, 20 oz tube)
  • 1 box of setting blocks (neoprene, 100 mm long, 6 mm thick)
  • 1 roll of gaskets (dry glazing or wet glazing, as specified)
  • 1 box of anchors and fasteners (stainless steel, per engineer)
  • 1 tube of primer for aluminum (e.g., Sika Primer-3)
  • 1 roll of backer rod (closed-cell polyethylene, diameter 1.5× joint width)
  • 1 bottle of glass cleaner (ammonia-free)
  • 1 roll of masking tape (2 in / 50 mm wide)
  • 1 tube of neutral-cure sealant for perimeter (e.g., silicone)

Instructions

  1. Review drawings and layout: Confirm the grid dimensions, anchor locations, and glass sizes against the structural drawings. Mark the slab edges with a chalk line and transfer the mullion centerlines using a transit or laser level.
  2. Install anchors: Attach steel or aluminum anchors to the slab edge using concrete screws or embed plates, following the engineer’s spacing (typically 24–36 in / 600–900 mm on center). Torque to spec.
  3. Set the first mullion: Stand the vertical mullion (typically 2×4.5 in / 50×115 mm) onto the anchor, plumb it with a level, and bolt it loosely. Check alignment with the adjacent mullion using a string line. Tighten bolts once plumb.
  4. Continue mullions: Install all vertical mullions across the elevation, maintaining plumb and alignment. Use a laser level to keep the face plane flat.
  5. Install transoms (horizontals): Cut transoms to length (allow 1/8 in / 3 mm gap each side for thermal movement) and connect them to the mullions with shear blocks or screws. Level each transom and ensure the frame is square.
  6. Set the glass: Clean the frame and glass edges with ammonia-free cleaner. Place setting blocks at quarter points (about 4 in / 100 mm from each corner) on the bottom frame. Set the glass panel onto the blocks, centering it. Use suction cups for large panels.
  7. Secure the glass: For dry glazing, snap the gasket into the frame. For wet glazing, apply structural silicone to the frame’s glazing pocket and press the glass in, then tool the silicone to a smooth bead. Allow silicone to cure per manufacturer (typically 24–48 hr).
  8. Apply backer rod and sealant: After the structural silicone cures, insert backer rod into the perimeter joints (between glass and frame) to control sealant depth. Mask the edges, apply a bead of neutral-cure sealant, and tool it smooth. Remove masking tape immediately.
  9. Inspect and test: Check all seals for continuity, and perform a water spray test (ASTM E1105) if required by the project spec. Repair any leaks before proceeding.

Tips

  • Substitutions: If structural silicone isn’t available, use a high-performance polyurethane sealant, but note it has lower UV resistance and may need more frequent maintenance.
  • Storage: Keep sealant and primer at 40–80°F (4–27°C) before use. Cold sealant won’t cure properly; hot sealant can sag.
  • Common mistake: Skipping the primer on aluminum causes adhesion failure. Always apply primer to bare metal and let it flash (dry) for the time stated on the label.
  • Safety: Wear cut-resistant gloves when handling glass and use a vacuum lifter for panels over 50 lb (23 kg). Never stand under a suspended panel.

Serving Suggestions

This curtain wall is best “served” as a fully glazed facade that meets the building’s thermal and water-performance specs. Pair it with proper interior finishes—like insulated glass units (IGU) with low-E coatings—to maximize energy efficiency. For a dramatic look, use large vision glass panels with spandrel glass in between floors.

Variations

  • Unitized curtain wall: Pre-assemble frames and glass in the factory, then hoist and bolt to anchors. Faster on site but requires crane and more precise fabrication.
  • Structural glazing: Use only structural silicone to hold the glass, with no mechanical fasteners—gives a seamless glass look but requires strict quality control.
  • Spider glazing: Use point-supported glass with stainless steel spider fittings—ideal for atriums and large spans.
  • Double-skin facade: Add an outer glass layer with a ventilated cavity for improved insulation and sound reduction.

Storage and Reheating

Store unused sealant tubes upright in a cool, dry place (below 80°F / 27°C) for up to 12 months unopened. Once opened, use within a week or discard—silicone skins over and becomes unusable. Gaskets and setting blocks can be stored indefinitely in a dry area. If you need to “reheat” (rework) a joint, cut out the old sealant with a razor knife, clean the surface, and re-apply new sealant. Do not apply new sealant over old—adhesion will fail.

Frequently Asked Questions

How long does the structural silicone take to cure? Most structural silicones cure in 24–48 hours at 70°F (21°C) and 50% humidity. Cold or humid conditions extend cure time; check the manufacturer’s data sheet for exact times.

Can I install curtain wall in cold weather? Yes, but sealants need to be applied above 40°F (4°C). If temperatures are lower, use a heated enclosure or choose a low-temperature sealant. Also, allow for thermal contraction—increase joint gaps slightly.

What is the maximum glass size I can use? That depends on wind load and glass thickness. Typically, a 1/4 in (6 mm) annealed glass can span up to 5 ft (1.5 m) wide, but for larger sizes, use tempered or laminated glass. Always consult a structural engineer.

How do I prevent water leaks? The key is proper drainage—design weep holes at the bottom of each mullion and keep them unblocked. Also, ensure the sealant is continuous and tooled to avoid pinholes. Test with water spray after installation.

Can I reuse old glass panels? Yes, if they are not chipped or scratched and meet current safety standards. However, reusing glass in a new curtain wall may void warranties and may not meet energy codes. Check with the manufacturer.

What’s the difference between curtain wall and storefront? Curtain wall spans multiple floors and is anchored to the slab edges, while storefront is typically single-story and sits on a sill. Curtain wall also handles higher wind loads and thermal movement.

Related

More recipes to cook

Safety notes: safe minimum internal temperatures from USDA FSIS; raw and undercooked fish guidance from the U.S. FDA. Food safety notes

Spotted an error? Tell us and we will correct it (corrections policy).