Glazing bars are the aluminum or steel profiles that clamp and seal polycarbonate roof panels to the rafters, keeping the roof watertight while allowing the panels to expand and contract with temperature changes. This guide walks you through the complete installation of glazing bars for a polycarbonate roof, from measuring and cutting to securing the bars and fitting the end caps. It works because the method follows the manufacturer-approved sequence: dry-fit the bars, seat the panel, then tighten the clamp plate—no sealant needed on the bar itself.
Ingredients
- Glazing bars (aluminum or steel) – quantity equal to number of rafters, each cut to rafter length (e.g., 12 bars for a 12-rafter roof)
- Polycarbonate panels – 1 per bay (width between bars) plus 1 extra for mistakes, cut to rafter length
- Self-tapping screws with EPDM washers – 2 per bar per rafter (e.g., 24 screws for 12 bars on 2 rafters each)
- End caps (plastic or aluminum) – 2 per bar (top and bottom)
- Butyl tape or EPDM foam strip – 1 roll (for sealing panel ends if required by your bar profile)
- Neoprene washers – 4 per bar (for the clamp plate screws)
- Clamp plate (often included with glazing bar) – 1 per bar
- Expansion gap filler – 3 mm (1/8 in) thick foam cord, length equal to total panel width
Instructions
- Measure the rafter length. From the fascia board to the ridge beam, measure the exact distance. Add 50 mm (2 in) to allow for overhang at the eaves. Cut each glazing bar to this length using a miter saw with a non-ferrous metal blade. Deburr the cut ends with a file.
- Prepare the polycarbonate panels. Cut panels to the same length as the bars. Use a fine-tooth circular saw (10 teeth per inch) or a sharp utility knife for thin sheets. If the panel has a UV-protected side, ensure that side faces upward (usually marked with a film).
- Drill pilot holes in the bars. Place the first glazing bar on the rafter at the roof edge. Mark screw locations at each rafter crossing (typically every 600 mm / 24 in). Drill 6 mm (1/4 in) holes through the bar base. Do not drill through the rafter yet.
- Secure the first bar. Position the bar on the rafter, align it straight, and drive self-tapping screws with EPDM washers through the pilot holes into the rafter. Do not overtighten—just snug so the washer slightly compresses. This bar becomes the fixed reference.
- Lay the first panel. Slide the polycarbonate panel into the side channel of the fixed bar. The panel should sit with a 3 mm (1/8 in) gap at the top and bottom for expansion. If the panel is longer than the bar, trim it now.
- Install the next bar. Place the second glazing bar over the free edge of the panel, aligning it with its rafter. The panel should fit into the channel of this bar. Drill pilot holes and screw it down as in step 4. This bar clamps the panel between the two bars.
- Repeat for remaining panels. Continue laying panels and securing bars across the roof. For the last panel, use the extra panel you cut to ensure a tight fit. Leave a 3 mm (1/8 in) gap between the last panel and the end wall or trim.
- Install the clamp plates. For each glazing bar, place the clamp plate (a flat aluminum strip) over the top of the bar. Secure it with the provided screws and neoprene washers. Tighten evenly to compress the EPDM gasket against the panel—do not crush the polycarbonate.
- Fit the end caps. Snap or screw the end caps onto the top and bottom of each glazing bar. These keep out insects and debris. If your bar uses a separate cap, apply a small bead of silicone to the cap’s inner edge before pressing it on.
- Seal the panel ends. If your glazing bar design requires it, apply butyl tape or EPDM foam strip along the top edge of the panel before the cap is installed. This prevents water from wicking into the panel’s honeycomb structure.
- Check the expansion gaps. Verify that every panel has a 3 mm (1/8 in) gap at the top and bottom. Insert foam cord into these gaps if the manufacturer specifies it. This prevents the panels from buckling when they expand in heat.
Tips
- Substitute for glazing bars: If you can’t find aluminum bars, use galvanized steel “Z” purlins, but note they are heavier and may corrode over time. Always use EPDM washers to prevent galvanic corrosion between steel screws and aluminum bars.
- Common mistake—overtightening: Screwing the clamp plate too tight will compress the polycarbonate and cause stress fractures. Tighten until the gasket just touches the panel, then give a quarter turn.
- Storage: Keep glazing bars and panels in a dry, shaded area before installation. Direct sunlight on stacked polycarbonate can cause the panels to warp. Store them flat, not on edge.
- Cutting polycarbonate: Use a blade with a fine tooth count (10-12 teeth per inch) to avoid chipping. If you must cut with a jigsaw, use a fine-tooth blade and clamp the panel firmly to prevent vibration.
Serving Suggestions
Once your glazing bars are installed, the roof is ready for use. Pair this with a proper flashing system at the ridge and eaves. For a finished look, install a gutter along the eaves to manage rainwater. If the roof is for a patio, consider adding a ceiling fan or shade cloth to reduce heat buildup under the polycarbonate.
Variations
Different bar profiles: Some glazing bars have a “dry” system (no sealant) while others are “wet” (require sealant). Follow the manufacturer’s instructions for your specific profile. Insulated panels: If you use multi-wall polycarbonate (e.g., 16 mm or 25 mm), you’ll need wider glazing bars designed for that thickness. Curved roofs: For curved polycarbonate, use flexible glazing bars that bend to the radius; these are typically aluminum with a curved base. End caps with drainage: Some caps have weep holes to let condensation escape—choose these for humid climates.
Storage and Reheating
This is a construction project, not a meal, but if you need to pause mid-installation: store cut bars and panels indoors, off the ground, and cover them with a tarp to protect from dust. Unused screws and washers keep in a sealed container for months. If you remove a glazing bar for maintenance, clean the old butyl tape off with a solvent and replace it with new tape before reinstalling. The roof itself requires no “reheating”—just periodic cleaning with mild soap and water to maintain clarity.
Frequently Asked Questions
Can I use wood as glazing bars? Yes, but wood is not recommended because it expands and contracts with moisture, which can crack polycarbonate panels. If you do use wood, treat it with a waterproof sealer and use a rubber gasket between the wood and panel.
How much expansion gap do I need? Polycarbonate expands about 3 mm per meter (0.04 in per foot) over a 50°C (90°F) temperature change. So for a 3 m (10 ft) panel, allow a 9 mm (3/8 in) total gap (split between top and bottom). The 3 mm (1/8 in) gap in the instructions is a minimum for short panels; adjust for your climate.
Do I need to seal the glazing bar ends? Yes, always install end caps. If you skip them, insects and debris will enter the bar channel and block water drainage, leading to rust and leaks.
Can I install glazing bars on an existing roof? Yes, but you must first remove the old roofing material and ensure the rafters are sound. You’ll need to attach the bars to the rafters, which may require adding furring strips if the rafters are not exposed.
What is the best screw type? Use self-tapping screws with EPDM washers, specifically designed for metal roofing. They create a watertight seal and prevent galvanic corrosion. Do not use regular wood screws.
Why is my roof leaking? Common causes: missing end caps, overtightened clamp plates that crack the panel, or the panel not sitting fully in the bar channel. Check each bar for gaps and re-seat the panel if needed. Also, verify that the overlap between panels is at least 50 mm (2 in) if you are overlapping sheets.
Related
- Bacon Up Recipes: 12 Ways to Cook with Bacon
- Bacon vs Avis Budget Group Settlement: Full Guide
- Top Rated Bacon Quiche Recipes for Every Meal
More recipes to cook
Safety notes: safe minimum internal temperatures from USDA FSIS; raw and undercooked fish guidance from the U.S. FDA. Food safety notes
Spotted an error? Tell us and we will correct it (corrections policy).